Campus Community, Science, Technology and Health

The future of STEM at SU is within reach

August 26, 2019

Share this

The Center for Science and Innovation took a big step forward with the installation of the project tower crane on Aug. 24. Rising 230 feet above campus, the crane counterweights weigh more than 120,000 pounds and its jib, or arm, extends 246 feet. Visit Facilities for construction bulletins relating to the project and CSI for more information on the facility, which is scheduled to open in 2021. 

For more photos taken by Lara Branigan, director of Design + Construction, visit CSI Crane Installation.

Share this